Waste Management Solutions

Why Waste Management?

Throughout our experience in Latin America, we directly faced the widespread use of open-air landfills and the impact they have on communities and the environment.

Thanks to our technological partner in pyrolysis, who has a patented and proven process, and with the experience of our alliance members, TPS has developed a creative business model that achieves efficient solid waste management.

As a group, we have created alternatives capable of classifying and utilizing all types of waste, reducing and even eliminating the environmental impact of landfills to create useful and marketable products.

Giving Waste a New Life

In a traditional landfill, waste is simply “dumped” and sometimes buried.

TPS will transform waste into useful products such as:

Using the following technologies

Marketable Products

We plan to produce the following marketable products. The plant will consist of 5 buildings where activities will be separated for optimal operation:

energia

CLEAN ENERGY

The energy production will be approximately 1.5 megawatt per ton of organic MSW

oil 1

PETROLEUM PRODUCTS

The petroleum production will be approximately 180 gallons per ton of mixed plastic waste

edg

STEAM

Capable of producing 150 PSI saturated steam at high volumes for industrial use

Marketable Byproducts

foto1

FERTILIZER

foto 2

FLY ASH

foto3

CHAR/ASPHALT

asset 7@300x

A Modern and Efficient Plant

The project consists of a Municipal Solid Waste (MSW) recovery plant with capacity to process approximately 1250 MTPD.

The plant will consist of various specialized facilities for effcient operation of processing MSW.

Plant is designed with future expansion in mind with a focus on efficiency. Unlike most plants worldwide that can process 30–40% of waste, ours will be able to process up to 93%.

Investment

USD

$ 0

million

Up To

0

new jobs

Waste Per Day

0

tons

or

0

trucks

Our Plans

TPS Land_ll Solutions LLC has created a proprietary design that can be replicated for future plants. TPS designs, engineers, constructs, and operates its own municipal solid waste (MSW) conversion facilities, securing project financing through strategic partnerships with national and international financial institutions.

We are currently in the process of obtaining permits for the construction of a plant in Guanagazapa, Escuintla. TPS is also open to technically supporting the design of required transfer stations to serve various municipalities in a coordinated manner.

The construction of the plant is expected to take approximately 18 months once all environmental and construction licenses are granted.